Food Production Line Shipping & Payment | Panda Machinery

Ordering & Delivery

How a production line is packed,
paid for and accepted

Container split, packing method, trade terms, payment schedule, objection window and warranty handling. Every figure below is the one we put in the offer, so your forwarder, your bank and your customs broker can work from the same page.

11.8 mLongest single piece we can ship
5–200 tTotal gross weight per line
40% / 60%Deposit and payment before shipment

Fitting the line into containers

The number of containers is set by the line model, not by a fixed rule: a single machine and a complete line are quoted with different splits, and 20GP, 40GP and 40HQ are all used depending on what the crate sizes allow.

Limits per shipment

Item Limit
Longest single piece 11.8 m
Widest single piece 2.3 m
Highest single piece 2.5 m
Heaviest single piece 20 t
Total gross weight per line 5–200 t
Total volume per line 70–1,400 CBM
Oversize items such as the tunnel oven body and the cooling tunnel are loaded in sections and layers rather than as complete units.The container split is fixed at the offer stage, so you know the freight cost before the deposit is paid.

Packing, chosen by destination

Three packing methods are used, and the choice follows the import requirements of the destination country rather than a single house standard. Tell us the destination port and the requirement is fixed at the offer stage.

1Fumigated wooden caseSolid timber packing, heat or chemical treated, for destinations that accept or require timber.
2Steel frameOpen steel cradle for large fabricated parts that do not need a closed case.
3Vacuum anti-rustSealed barrier packing with desiccant for machined surfaces on long sea voyages.

Trade terms and who insures

EXW, FOB, CFR, CIF, DAP, DDU, DDP and FCA are all available. Where the cost of the goods passes from seller to buyer is set by INCOTERMS 2000 together with the terms agreed in the contract.

Marine insurance under each term

Term Who insures
EXW, FOB, FCA, CFR, DDP Buyer
CIF, DDU Seller
After the goods reach port, we assist with clearance by supplying the documents you need: commercial invoice, packing list, certificate of origin and bill of lading on request.

Documents that travel with the goods

The document set is standard for both modes of trade; what changes is the language of the operation manual.

Shipping documents

Document Supplied
Packing list With every shipment
Commercial invoice With every shipment
Certificate of origin With every shipment
Operation manual English for overseas projects, Chinese for domestic projects

Payment and settlement

The schedule is a deposit before production and the balance before shipment. Letters of credit are accepted at sight; documents against acceptance and documents against payment are not.

Payment terms

Item Term
Deposit 40% T/T in advance
Balance 60% T/T before shipment
Letter of credit 100% LC at sight accepted
Not accepted D/A, D/P and PBL
Currencies USD / EUR / CNY
Receiving account Our corporate USD, EUR or CNY account, funded from the buyer's company account
Installments and financing Not offered for international trade
Looser terms A longer credit line raises the price and extends the delivery time
40 / 60
Deposit 40%, balance 60%

The deposit is paid before production and the balance before shipment. Both payments go from the buyer's company account into our corporate USD, EUR or CNY account.

Acceptance, objections and returns

Acceptance runs against the parameter sheet in the contract. If something does not match it, the objection has a defined window and a defined route.

Acceptance and after-sales terms

Item Term
Acceptance standard The parameter sheet agreed in the contract
Objection window Within 30 days of arrival at port, in writing or by email
Quality within warranty Caused by the machine and not by operator error or unstable site conditions: all costs borne by the seller
Return freight and duties Borne by the party at fault
Service outside warranty Paid service, priced by agreement against the market rate at the time
Force majeure Responsibility allocated as agreed in the contract

Frequently asked questions

The five questions buyers ask most often once the contract is being drafted.

How many containers does a complete line need?−

It depends on the line model, so there is no fixed container type or count. 20GP, 40GP and 40HQ are all used, and the split is confirmed at the offer stage. Oversize items such as the tunnel oven body and the cooling tunnel are loaded in sections and layers.

What is the largest single piece you can ship?+

11.8 m long, 2.3 m wide, 2.5 m high and 20 t in weight. A complete line runs from 5 to 200 t in total gross weight and from 70 to 1,400 CBM in total volume.

What are the payment terms?+

40% T/T in advance and 60% T/T before shipment, or 100% LC at sight. D/A, D/P and PBL are not accepted. We invoice in USD, EUR or CNY, and both payments come from the buyer's company account into our corporate account.

Who arranges the marine insurance?+

The buyer under EXW, FOB, FCA, CFR and DDP; the seller under CIF and DDU. The split follows INCOTERMS 2000 together with the terms agreed in the contract.

How long do we have to raise a quality objection?+

Thirty days from the arrival of the goods at port, in writing or by email. Faults caused by the machine itself, rather than by operator error or unstable site conditions, are repaired at the seller's cost, and return freight is borne by the party at fault.

Send your port, get the loading plan

Send the line model, the destination port and the trade term you want to work on. We will come back with the container split, the packing method for that destination, and the total gross weight and volume your forwarder needs to quote.

Request a Shipping Plan
Shanghai Panda Machinery Co., Ltd.pandamachinerysh@gmail.comExport to more than 150 countries
Leave a message
Name *
Email *
Country
Tel / Whatsapp
Message *
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.